LFG is a byproduct from decomposition of MSW. Until 2000, landfill gas sites were not given importance in Asia. But, once CDM got matured so many project developers started hunting for landfill sites to develop landfill gas recovery projects under CDM mechanism. Most of the sites in Asia were of open dump type. However, recently engineered landfills have been prepared for MSW waste disposal.

Over a period of time, the disposed MSW landfill site undergoes anaerobic digestion leading to the production of landfill gas that contains 45 – 50% methane. Gas emission depends on waste composition, weather condition and landfill management. For good LFG generation, the amount of waste dumped should be greater than 1 million tonne in a site with a depth of more than 10 m, preferably without any major fire accident that lasts for several weeks during the operation of the landfill.

If rainfall is low, then LFG generation will be low, but the gas generation will last longer.

MSW dump sites

MSW dump sites

MSW dump sites

open flare

closed flare

Generally around 3 to 12 m3 of LFG can be generated per tonne of MSW.

The landfill gas can be recovered using a network of perforated gas collection pipes and can be used for power generation. Some landfill sites are flaring the gas with a closed flare. As the CDM methodology got stringent these days, project developers are going for closed flare system where the project emission is minimal when compared to open flares.

The production of LFG starts in a landfill site within a few months of waste disposal and lasts for about 10 years or more depending upon the composition of waste, its availability and moisture content. Generally depth of the landfill gas well is 80% of the height of the landfill site.

The gas is usually pumped out using a blower and the moisture is removed in the moisture trap and then cleaned using SO2 scrubber before passing it to the compressor and engine, to produce electricity. LFG production potential can be estimated either by thumb rule or model estimates. For reasonably accurate measurement, expensive test wells are needed. For the CDM purpose, uses of models are reasonably good.

Landfill is the least cost option for MSW management; however, there is risk of soil and ground water contamination during rainfall in the absence of proper leachate treatment system. In addition, it requires large space which is another hindrance for Landfill projects. For services related to landfill gas to power contact us.