| Involvement of Renewable Cogen Asia and its Directors in CDM, Biomass and Renewable Energy Projects for different customer groups (selected projects): |
Customer:
Role:
Country/Location:
Project Description:s |
Patum Rice Mill and Granary Public Co. Ltd.
Feasibility Study, Engineering & Tendering of EPC Contract, Project Advisory
Pathumthani, Thailand
The rice mill had an existing 2.4 MWe cogeneration plant which supplied part of the mill’s energy requirements. This cogeneration plant was upgraded by replacing the turbo-generator with that of 10 MWe capacity. Excess power from this plant is sold to the grid within the Small Power Producer (SPP) scheme of Thailand. |
Customer:
Role:
Country/Location:
Project Description: |
A.T. Biopower Co. Ltd.
Review of Feasibility Study, Independent Engineer, Advisory Services
Central Thailand
The project consists of a power plant of about 20 MWe using rice husk as fuel. The project is located at Central Thailand. The electricity generated is sold to the grid as an SPP. |
Customer:
Role:
Country/Location:
Project Description: |
Dan Chang Bio-Energy Co., Ltd.
Feasibility Study, Advisory Services, Full Scale Demonstration Project (FSDP) Evaluation, Sourcing of Funds, Performance Monitoring
Suphanburi,Thailand
This is a Special Purpose Company created by the Mitr Phol Group to implement a new 41 MWe cogeneration plants using bagasse and other biomass as fuel. It consists of a new high pressure system generating electricity and steam for the needs of the Mitr Phol Sugar Mill. More than 25 MWe of excess power is sold to the national grid on a firm 21-year contract.
|
Customer:
Role:
Country/Location:
Project Description:
|
Phu Khieo Bio-Energy Co., Ltd.
Feasibility Study, Advisory Services, FSDP Evaluation, Sourcing of Funds, Performance Monitoring
Chaiyaphum, Thailand
The project, consists of a 41 MWe new high pressure system designed to provide the energy (steam and power) needs of UFIC, a sugar mill within the same group, and to use its bagasse as fuel. Up to 29 MWe of electricity is sold to the grid.
|
Customer:
Role:
Country/Location:
Project Description: |
THS Bio-Energy Sdn. Bhd.
FSDP Evaluation, Advisory Services, Performance monitoring
Sabah, Malaysia
This 14 MWe cogeneration plant uses the oil palm empty fruit bunches (EFB), fibres and shell as fuel. It utilizes a boiler with a capacity of 80 ton/hour at 65 bar and 402°C live steam. The electricity generated is used in the palm oil process and the excess of upto 10MWe is exported to the grid. In addition, 25 tonnes of steam is produced and used for palm oil processing in the adjacent palm oil mill. |
Customer:
Role:
Country/Location:
Project Description: |
Gulf Electric Public Co., Ltd.
Fuel Availability Study, Project Advisory
Trang Province, Thailand
Gulf Electric PCL intends to put up a 20 MWe power project that will utilize wastes from rubber wood as the primary fuel. The project will produce electricity for sale to the grid. |
Customer:
Role:
Country/Location:
Project Description: |
Electrowatt-Ekono/ Thai Power Supply
Project Advisory Services
Chacheongsao, Thailand
The principal aim of the study is to find out the problems associated with the operation of the existing ESP in two 10.5 MW power plants and a 37 MW power plant (which belongs to TPS group) and to prepare documentation for upgrading the power plant emission control systems. |
Customer:
Role:
Country/Location:
Project Description: |
Rayong Municipality
FSDP Evaluation, Performance monitoring
Rayong, Thailand
This municipal waste to fertilizer and energy plant treats 25,550 tons municipal solid waste (MSW) per year through anaerobic digestion, which produces 5,800 tons of organic fertilizer and generates 5,100 MWh of electricity using a 600 kW gas engine system. |
Customer:
Role:
Country/Location:
Project Description: |
ECO Special Waste Management Private Limited
FSDP Evaluation, Performance monitoring
Singapore
This 1 MW cogen plant using wood chips from tree trimmings and horticultural wastes was designed and operated to provide steam and electricity for the operation of the waste management plant. |
Customer:
Role:
Country/Location:
Project Description: |
Bee Joo Industries, Pte Ltd.
FSDP Evaluation, Performance monitoring
Singapore
This 1 MW cogen plant using wood chips from tree trimmings and horticultural wastes was designed and operated to operation of the company. Heat recovered from the plant is used for various industrial waste processing operations of the company. |
Customer:
Role:
Country/Location:
Project Description: |
Titi Serong Edar Sdn Bhd
FSDP Evaluation, Performance monitoring
Perak, Malaysia
Implemented at a rice mill, the 1.5 MW project generates steam and power for the requirements of the rice mill. |
Customer:
Role:
Country/Location:
Project Description: |
Kumpulan Guthrie Sg Dingin Palm Oil Mill
FSDP Evaluation, Performance monitoring
Kedah, Malaysia
Guthrie, a palm oil company implemented this 2 MW cogeneration project to provide the electricity and steam requirements of its palm oil factory. |
Customer:
Role:
Country/Location:
Project Description: |
Angkor Bio Cogen Co., Ltd
Feasibility Study
Phnom Penh, Cambodia
Angkor Bio Cogen intends to implement a 2.0 MWe cogeneration project in its rice milling facility at Cambodia that will utilize rice husk as the primary fuel. At present, the mill is using an on-site power generating unit which uses diesel as fuel. Initially, the electricity and steam generated will be used internally. |
Customer:
Role:
Country/Location:
Project Description: |
Homet Raya Sdn. Bhd.
Advisory Services, FSDP evaluation
Sarikei, Sarawak, Malaysia
This 1.65 MWe wood waste-fired power plant consists of a boiler supplying steam to a fully condensing turbine. Power is supplied to the saw mill, while a part of the steam is used for kiln drying. |
Customer:
Role:
Country/Location:
Project Description: |
Sim Hoe Wood Industry Sdn. Bhd.
Advisory Services, FSDP evaluation
Bentong, Pahang, Malaysia
This cogeneration plant supplies all the electricity needed for the complete factory (sawmill and moulding), as well as 4 tons of steam for the kiln drying operation. |
Customer:
Assignment:
Country/Location:
Project Description: |
Laem Chabang Industry Co., Ltd.
Advisory Services, FSDP evaluation
Laem Chabang, Chonburi, Thailand
This wood processing company manufactures top quality frames for export. The company decided to invest in a dust extraction and storage system and use their wood residues as a source of energy for kiln drying. The residues are being combusted in a hot water boiler with a total capacity of 400,000 kcal/hr. |
Customer:
Assignment:
Country/Location:
Project Description: |
Areechai Wood Tech Co., Ltd.
Advisory Services, FSDP evaluation
Srakaew, Thailand
This wood processing company produces flooring (parquet). Large amounts of residues (sawdust, wood shavings, and slabs) are generated. Instead of being dumped or incinerated, sawdust and wood shavings are being sucked by a pneumatic collector system and are used as a source of energy in the boiler supplying steam to the kiln dryers. |
Customer:
Assignment:
Country/Location:
Project Description: |
Chia Meng Co. Ltd.
Advisory Services, FSDP evaluation
Nakorn Ratchasima, Thailand
This cogeneration plant consists of a boiler supplying steam to a condensing turbine of a capacity of 2.5 MWe. Flue gas and/or steam from the boiler can be used for paddy drying. |
Customer:
Assignment:
Country/Location:
Project Description: |
PT. Kurnia Musi Plywood Industries
Advisory Services, FSDP evaluation
Palembang, South Sumatra, Indonesia
This installation involves a turnkey supply of a wood waste-fired boiler. The steam is used for the process as well as to run an existing turbo-generator with a net output of 3.2 MWe. The boiler replaces 2 old boilers, which are not able to provide sufficient steam for the turbine. |
Customer:
Assignment:
Country/Location:
Project Description: |
Bekok Kiln Drying & Molding Sdn. Bhd.
Advisory Services, FSDP evaluation
Gemas, Negeri Sembilan, Malaysia
This wood waste-fired steam boiler produces steam for the heating of timber at the kiln drying plant. It was supplied with a wood dust extraction system from the wood molding plant and an automatic feeding system to the boiler. |
Customer:
Assignment:
Country/Location:
Project Description: |
Kilang Sawit Linggi Sdn. Bhd.
Advisory Services, FSDP evaluation
Pontian, Johore, Malaysia
This cogeneration plant was implemented to cover the palm oil mill power and heating requirements using the wastes from the mill. |
Customer:
Assignment:
Country/Location:
Project Description: |
Kumpulan Guthrie Berhad
Advisory Services, FSDP evaluation
Kulim, Kedah, Malaysia
This energy plant burns wood wastes to heat thermal oil up to 280 °C. The heated oil is then used for heating the continuous press for pressing the fiber; for heating water in a boiler to generate 10 tons of steam/hr; and for pre-heating the primary air used for the energy plant combustion chamber. The flue gas from the combustion chamber is cleansed in the dust cyclones and then used for drying of fiber. The wood waste-fired boiler was supplied to a new mill for timber drying operation. |
Customer:
Assignment:
Country/Location:
Project Description: |
Heveafil Sdn. Bhd.
Advisory Services, FSDP evaluation
Batang Kali, Selangor, Malaysia
The installation involves the treatment of wastewater by anaerobic digestion and utilization of the biogas produced (7820 Nm³/day) as fuel for the thermal oil heater in lieu of medium fuel oil. |
Customer:
Assignment:
Country/Location:
Project Description: |
Ban Heng Bee Rice Mill (1952) Sdn. Bhd.
Advisory Services, FSDP evaluation
Pendang, Kedah Darul Aman, Malaysia
This privately-owned rice mill is used both for milling and drying paddy operations. There are 56 dryers installed which were previously, running on heavy fuel oil. The availability of rice husks created the potential for the mill to run on a rice-husk fired boiler to supply the mill’s power and heating requirements. The cogeneration plant's installed capacity is 450 kWe. |
Customer:
Assignment:
Country/Location:
Project Description: |
Bumibiopower Sdn. Bhd. (Malaysia)
Project Advisory, Feasibility Study
Bangkok and Malaysia
Bumibiopower has signed a 21-year Renewable Energy Power Purchase Agreement (REPA) with TNB on a “take and pay basis.” The power plant shall have one power block consisting of a biomass-fired grate boiler, a condensing steam turbo-generator and the required auxiliary equipments associated with the plant. The technology, which will use oil palm wastes as fuel will use a vibrating hydrograte or reciprocating grate boiler. |
Customer:
Assignment:
Country/Location:
Project Description: |
10 feasibility studies for various customers
Project Advisory, Feasibility Study
Philippines
The project involves conducting 10 rice husk feasibility studies in Philippines at various locations |
Customer:
Assignment:
Country/Location:
Project Description: |
4 feasibility studies for various customers
Project Advisory, Feasibility Study
Lao PDR
The project involves conducting 4 biomass fired feasibility studies in Lao PDR at various locations |
Customer:
Assignment:
Country/Location:
Project Description: |
Confidential customer
Preliminary Market study
Dubai, Sharjah and Abu Dhabi
The project involves market assessment for the development of solar energy business |
Customer:
Assignment:
Country/Location:
Project Description: |
DRDO
Design, Construct and commission of solar water heaters
Pondichery, India
The project involves site visit, design, construction and commissioning of solar water heaters of domestic scale and industrial scale at various parts in Pondichery |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
UN Organization
PDD for a 5 MW rice husk power plant
Africa
November 2007 – April 2008
Preparation of Project Design Document |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
RDE/DEM/AEP/S.P.O
1 MW biogas power plant from waste water treatment facility in Palm Oil Mill
Sinpun, Thailand
October 2007 – October 2008
Preparation of Project Design Document |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
RDE/DEM/AEP/SSAI
1 MW biogas power plant from waste water treatment facility in Palm Oil Mill
Kanjanadij, Thailand
October 2007 – October 2008
Preparation of Project Design Document and assistance in validation |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
RDE/DEM/AEP/TTO1
1 MW biogas power plant from waste water treatment facility in Palm Oil Mill
Bangsawan, Thailand (TTO1)
October 2007 – October 2008
Preparation of Project Design Document |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
RDE/DEM/AEP/TTO2
1 MW biogas power plant from waste water treatment facility in Palm Oil Mill
Sai Khung, Thailand
October 2007 – October 2008
Preparation of Project Design Document |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
RDE/DEM/AEP/OTACO
1 MW biogas power plant from waste water treatment facility in Palm Oil Mill
Trang, Thailand
October 2007 – October 2008
Preparation of Project Design Document |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
RDE/DEM/AEP/ABP
9.5 MW Grid-connected Electricity Generation from wood waste
Buriram, Thailand
June 2007 – June 2008
Preparation of Project Design Document |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
RDE/DEM/AEP/BBP
8 MW Grid-connected Electricity Generation from rice husk
Bua Yai, Thailand
June 2007 – June 2008
Preparation of Project Design Document |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
AEP/SAHASIN
8 MW Wastewater Treatment with Biogas System in Starch Plant
Chantaburi, Thailand
June 2007 – June 2008
Preparation of Project Design Document |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
RDE/BNB/NES
Fuel Switching from LPG to biogas
Thailand
December 2006 – July 2007
Preparation of Project Design Document |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
RDE/BNB/NPO
1 MW Electricity Generation from Biogas Plant
Thailand
December 2006 – July 2007
Preparation of Project Design Document |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
RDE/BNB/P.V.D.
4 MW Wastewater Treatment with Biogas Technology in Tapioca Processing Plant
Thailand
November 2006 – July 2007
Preparation of Project Design Document |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
RDE/BNB/SIMA 4
2.5 MW Wastewater Treatment with Biogas Technology in Tapioca Processing Plant
Roi Et, Thailand
November 2006 – July 2007
Preparation of Project Design Document |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
RDE/TMB/BNB/SIMA 2
Biogas from treating Wastewater in Starch Plant used for heating purpose
Chachoengsao, Thailand
June 2005 – July 2007
Preparation of Project Design Document |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
RDE/TMB/BNB/SIMA1
2 MW Wastewater Treatment with Biogas System (UASB) in a Starch Plant
Nakhorn Ratchasima, Thailand
June 2005 – July 2007
Preparation of Project Design Document |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
RDE/BNB/SEL
9.5 MW Palm Oil Waste Fuelled Power Plant
Krabi, Thailand
January 2006 – July 2006
CDM risk assessment, conduct of PIN, recommendation for CER buyers |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
Philrice/EAEF Project
Report on CDM status
Philippines
July 2005
Prepared a report: Status of CDM and its applicability for Rice Husk Power Plants |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
Philrice/EAEF Project
Estimation of CO2 emission reduction potential for 10 rice husk power plants
Philippines
August 2004 – July 2005
The project involves conducting 10 rice husk fired feasibility study at several locations in the Philippines including estimation of CO2 emission reduction potential. |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
Regional Biomass Energy Agency (Belgium)/EAEF
Estimation of CO2 emission reduction potential for 4 power plants
Lao PDR
October 2004 – July 2005
The project involves conducting 4 biomass fired feasibility study at several locations in the Lao PDR including estimation of CO2 emission reduction potential. |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
CEPALCO/EAEF
Estimation of CO2 emission reduction potential for a biomass fired cogeneration plant
Philippines
September 2004 – August 2005
The project involves conducting biomass fired feasibility study at Philippines including estimation of CO2 emission reduction
potential. |
Customer:
Assignment:
Country/Location:
Date:
Project Description: |
EC Project
Conduct of a CDM seminar
Ho Chi Ming, Vietnam
2004
The project involves organizing a CDM Seminar in Vietnam |
Customer:
Project:
Country/Location:
Date:
Project Description: |
UN Organization
Feasibility study for a 5 MWe-Rice Husk Fired Power Plant
Africa
November 2007 –February 2008
The project aims to:
• Investigate and assess the availability and potential of rice husk as a fuel
• Review commercially proven rice husk power generation technologies
• Forecast project returns
• Analyse risks and propose mitigation measures
• Propose an operation and management structure |
Customer:
Project:
Country/Location:
Date:
Project Description: |
EU-Thailand Economic Cooperation, Small Project Facility/Asian Institute of Technology
Training on, and transfer of, efficient EU technologies in the sugar sector in Thailand
Thailand
January 2006 – April 2007
The overall objective of the project is to prepare the Thai sugar mills for business co-operation with European suppliers of technologies associated with the sugar sector. |
Customer:
Project:
Country/Location:
Date:
Project Description: |
Regional Biomass Energy Agency (Belgium)/EC-ASEAN Energy Facility
Developing a National Scheme and Conduct of Feasibility Studies on the Implementation of Decentralised Energy Systems using Biomass and/or Indigenous Coal as Fuel in Lao PDR Lao PDR
March 2005 – August 2006
The overall goal of this project is to promote the use of biomass and/or indigenous coal in decentralised power plants in Lao PDR. More specifically, it aims to:
• Investigate, assess and map-out the availability and potential of biomass and indigenous coal as fuel;
• Review commercially proven biomass/coal power generation technologies that are suitable for applications in Lao PDR;
• Investigate and recommend appropriate financial sources and financial instruments that can be used in financing decentralised energy systems in Lao PDR;
• Conduct feasibility studies at selected sites;
• Produce a Project Implementation Guide and Market Investment Pack for all the feasible projects
|
Customer:
Project:
Country/Location:
Date:
Project Description: |
Philippine Rice Research Institute/EC-ASEAN Energy Facility
Enhancing the energy self sufficiency of rice mills
Philippines
February 2005 – August 2006
The main goal of this project is to identify rice mills or cluster of rice mills suitable for the implementation of rice husk energy plants. The technically feasible and commercially viable projects will be selected to be developed into investment opportunities. The investment forum aims to bring in local private sectors, rice mills and foreign investors to implement rice husk energy plants. |
Customer:
Project:
Country/Location:
Date:
Project Description: |
Cagayan Electric Power and Light Co./EC-ASEAN Energy Facility
Feasibility study for distributed generation and renewable energy portfolio of a distribution company
Philippines
March 2005 – September 2006
The objective of the project is to map out a distributed generation and renewable energy strategy for a distribution utility under a restructuring power sector. Up to three renewable energy technologies, which have the potential for distributed generation, are the focus of the activities. One project involves a bagasse-fired cogeneration plant. Another is a mini-hydro plant that directly supplies into the electric grid. The third is the grid-connected rooftop photovoltaic plant, which shall primarily serve as a daytime dedicated load of a building and supply any excess power to the electric grid. |
Customer:
Project:
Country/Location:
Date:
Project Description: |
AIT/EAEF
Capacity building in formulating harmonized policy instruments for the promotion of renewable energy and energy efficiency in the ASEAN Member Countries
ASEAN Member Countries
January 2005 – January 2006
The specific objectives of the project are:
• To analyse and compile the current Renewable Energy (RE) and Energy Efficiency (EE) policies in the different ASEAN Member countries and document their success;
• To analyse the specific difficulties and barriers faced by ASEAN countries in disseminating and promoting RE
and EE and to understand the gaps that need to be filled up in terms of policies and regulations;
• To build capacity in the formulation and implementation of harmonized renewable energy and efficiency energy
policies in the ASEAN region;
• To create a network of policy makers, business executives, consumers and civil society that will push for the
formulation and adoption of appropriate and consistent policy instruments. |
Customer:
Project:
Country/Location:
Date:
Project Description: |
AIT/EAEF
Setting up of National Associations for Cogeneration and Decentralized Energy Systems in ASEAN Countries
ASEAN Member Countries
January 2005 – January 2006
The main objective of this project is to establish National Associations for promoting cogeneration and distributed energy systems in individual ASEAN countries. The project also aims to assist in the creation of a regional network among these associations at different countries. |
Customer:
Project:
Country/Location:
Date:
Project Description: |
European Commission
EC-ASEAN COGEN Programme Phase III
ASEAN & Europe
January 2002 – December 2004
COGEN Phase III has been oriented towards concrete projects both for demonstration purposes and to enhance the implementation of cogeneration in the ASEAN region through partnerships between the European and ASEAN companies. The Programme directly increased EU-ASEAN economic co-operation by:
• approximately 208.8 million Euro
• contributing 174MW to the ASEAN energy supply
• avoiding approx. 1.7 million tonnes of carbon equivalent/year of emissions (563 MW)
• increasing level of cogeneration in ASEAN by 5.7% (5,768 MWe)
• increasing the confidence of the ASEAN end-users in modern cogeneration technologies
• bringing new, more efficient technologies to the region, in key sectors such as the sugar sector in Thailand and
in the palm oil sector in Malaysia
• increasing awareness of ASEAN and EU stakeholders on cogeneration
through seminars, training events and study tours (around 3,800 participants from most EU and ASEAN
countries) and various marketing means.
Over 200 potential cogeneration projects were identified during the duration of COGEN 3. |
Customer:
Project:
Country/Location:
Date:
Project Description: |
European Commission
EC-ASEAN COGEN Programme (Phase I & Phase II)
ASEAN & Europe
January 1991 – January 1999
The COGEN Programme is an economic cooperation programme between the European Commission (EC) and the Association of South-East Asian Nations (ASEAN) coordinated by the Asian Institute of Technology (AIT), Bangkok, Thailand. Its aim is to accelerate the implementation of proven technologies generating heat and/or power from wood and agro-industrial residues through partnerships between European and South-East Asian companies. Its activities include:
• Management of an economic cooperation fund from the European Commission for the promotion of clean
and efficient energy technologies in South East Asia
• Assessment of biomass resources, potential uses for energy and identification of appropriate technology
• Information scanning and dissemination: strategic business and technical information is disseminated both in
ASEAN and Europe
• Identification/development of business opportunities
• Development and management of databases
•
Technical, project development and financing advice
• Pre-Investment and feasibility studies
• Capacity building activities
• suppliers |
Customer:
Project:
Country/Location:
Date:
Project Description: |
European Commission
Full Scale Demonstration Project (FSDP) Implementation
ASEAN countries
1992 – December 2004
The Project consists of the implementation of proven cogeneration technologies on a full-scale basis using biomass, coal and natural gas as fuel in order to demonstrate their technical reliability and economic viability. Projects implemented within this framework qualify according to the criteria of: technical and commercial viability, replicability, and national energy/environmental impact. More than 20 FSDPs with an aggregated project cost of more than 150 million Euros (~200 million USD) and with up to 40 MWe maximum individual capacity have been implemented in the ASEAN region. Specific activities included:
• Design of funding set up, selection procedure and adjudication criteria for funding support to the projects within the FSDP scheme
• Workshops/Seminars to create awareness of cogeneration opportunities and technologies and to introduce the
FSDP scheme
• Solicitation of project proposals
• Evaluation, adjudication and selection of projects
• Advisory services during implementation
• Definition and design of training and technical monitoring activities
• Promotional activities for the replication of projects |
Customer:
Project:
Country/Location:
Project Description: |
UK based company
10 MW wood waste fired power plant
Africa
Full feasibility study
|
Customer:
Project:
Country/Location:
Project Description: |
UK based company
10 MW wood waste fired power plant
Africa
Preparation of Project Design Document
|
Customer:
Project:
Country/Location:
Project Description: |
UN Organization
Rice husk based power generation project
Nigeria
Study on fuel supply-availability in a rice mill cluster in Africa
|
Customer:
Project:
Country/Location:
Project Description: |
UK based company
14 MW wood waste fired power plant.
Africa
Preparation of Project Design Document
|
Customer:
Project:
Country/Location:
Project Description: |
UK based company
14 MW wood waste fired power plant.
Africa
Preparation of Project Documents for loan purpose
|
Customer:
Project:
Country/Location:
Project Description: |
UN Organization
3 MW Rice husk based power generation
Nigeria
Full feasibility study
|
Customer:
Project:
Country/Location:
Project Description: |
AEP/Thai Oil Power
Heat recovery from Gas turbine flue gas
Thailand
Study on Assessment of CDM Potential
|
Customer:
Project:
Country/Location:
Project Description: |
UK based company
2 MW cattle dung to electricity project
South Africa
Study on Assessment of CDM Potential
|
Customer:
Project:
Country/Location:
Project Description: |
AEP
MSW projects in Thailand.
Thailand
Study on Assessment of CDM Potential
|
Customer:
Project:
Country/Location:
Project Description: |
Private company based in Thailand
CDM potential for a combined cycle project
Vietnam
Study on Assessment of CDM Potential
|
Customer:
Project:
Country/Location:
Project Description: |
Centre for Rural Technology, Nepal
Pre feasibility study on Electricity generation from Rice husk
Nepal
Pre-feasibility study.
|
Customer:
Project:
Country/Location:
Project Description: |
Private company based in Bangladesh
2 MW rice husk fired power plant
Bangladesh
Pre-feasibility study for rice husk power generation.
|
Customer:
Project:
Country/Location:
Project Description: |
AEP/KS Bio Power
Wastewater treatment with biogas system in a starch Plant for energy & environment conservation (K.S. Bio Power)
Thailand
Preparation of Project Design Document
|
Customer:
Project:
Country/Location:
Project Description: |
AEP/EGAT
Energy efficiency improvement through retrofitting the turbines
Thailand
Preparation of Project Design Document
|
Customer:
Project:
Country/Location:
Project Description: |
Confidential customer from Kenya
Power generation from wood waste
Africa
Conduct of feasibility study
|
Customer:
Project:
Country/Location:
Project Description: |
A rice mill in Guyana
Rice Husk to electricity generation
Guyana
Power generation potential assessment study from rice husk
|
Customer:
Project:
Country/Location:
Project Description: |
A rice mill in India
Market study for rice husk ash
India
Market study for rice husk ash
|
Customer:
Project:
Country/Location:
Project Description: |
Canadian based company
Large scale wind energy projects in Asia
Pakistan, Srilanka
CDM potential assessment study
|
Customer:
Project:
Country/Location:
Project Description: |
A wood industry from Gabon
1.2 MW Power generation from wood waste
Gabon
Conduct of feasibility study
|
Customer:
Project:
Country/Location:
Project Description: |
UK based company
Feasibility study for a 20 MW MSW power plant and CDM potential assessment
Africa
Generation of electricity using MSW
|
Customer:
Project:
Country/Location:
Project Description: |
Private company
Carbon finance and CER sales facilitation for CDM projects
Equador
Renewable energy projects including biomass and hydro.
|
Customer:
Project:
Country/Location:
Project Description: |
Private sector company in Mauritius
CDM/power generation potential assessment for waste water treatment plant
Mauritius
Biogas power generation from waste water treatment facility
|
Customer:
Project:
Country/Location:
Project Description: |
Private sector company
Emission reduction potential assessment for a biomass power plant
Canary Island
Power generation from biomass
|
Customer:
Project:
Country/Location:
Project Description: |
Thailand based private company
Feasibility study for large scale wind farm
Thailand
Generation of electricity using wind turbines |
Customer:
Project:
Country/Location:
Project Description: |
Agro based company in Pakistan
Feasibility study for a 5 MW &10 MW rice husk based cogeneration plant and CDM potential assessment
Pakistan
Electricity and steam generation using rice husk |
Customer:
Project:
Country/Location:
Project Description: |
US Based project developer
Assessment and review of 15 MW coffee husk based power plant
Uganda
Technical and CDM Assessment of a coffee husk project |
Customer:
Project:
Country/Location:
Project Description: |
UN Organization
8 Number of Pre feasibility studies
Africa
8 Number of Pre feasibility studies |
Customer:
Project:
Country/Location:
Project Description: |
UN Organization
5 MW Rice husk based power generation
Nigeria
Tender Document Preparation |
Customer:
Project:
Country/Location:
Project Description: |
UK based company
Feasibility study for a large scale MSW power plant
Middle East
Generation of electricity using MSW |
Customer:
Project:
Country/Location:
Project Description: |
UK based company
5 MW biogas power generation from swine farm waste
Spain
Potential assessment study |
Customer:
Project:
Country/Location:
Project Description: |
UK based company
Feasibility study for a 30 MW MSW power plant and CDM potential assessment
Nigeria
Generation of electricity using MSW |
Customer:
Project:
Country/Location:
Project Description |
Agro based company in Pakistan
Feasibility study for a 3.5 MW biomass based cogeneration plant, CER estimation and strategic recommendation for project implementation
Pakistan
Cogeneration plant |
Customer:
Project:
Country/Location:
Project Description: |
UN Organization
2 MW wood waste based project report
Nigeria
Preparation of feasibility study report for gasification and steam thermal power plant |
Customer:
Project:
Country/Location:
Project Description |
Philippines based private company
Fuel supply assessment study, feasibility study, CER estimation, strategic recommendation for 10 MW biomass power plant
Philippines
Electricity generation using multi fuel biomass |
Customer:
Project:
Country/Location:
Project Description |
Canada based private company
ERU estimation and advice on ERU sales for a 32 MW electricity generation project in Europe.
Europe